THE TEST ON RELATION BETWEEN PIPELINE UNDERCUTTING AND WAVE FORCE CHANGES
-
摘要: 鉴于海底油气管道在海洋能源开发中的特殊意义,前人开展了大量管道安全试验研究,特别注重不同底床、不同波浪条件、不同埋置深度等方面的组合试验,本次试验针对危害管道安全的掏空和悬跨开展了波浪水槽试验,探讨黄河三角洲为主的粉土海床上掏空与管道受力关系,弥补这方面研究的不足,结果表明,海底管道受力变化与掏空过程密切相关。连续试验过程表明,海底管道与海床土、波浪水体之间存在密切关系。海底管道在波浪作用下冲刷掏空经历了3个演变阶段:泥沙起动阶段、水流隧道发育阶段、快速掏空阶段和冲刷平衡阶段。水流隧道伴随的管涌对冲刷掏空起重要作用。伴随冲刷掏空,管道波浪力出现规律性转化,从正向作用逐渐过渡到负向作用,也可以分出4个演化阶段:冲刷初始阶段,管道波浪力以正向为主,管道表现为正向力作用下的振动;隧道发育阶段,管道受到的作用力主要是波峰上举力和波谷下拉力,表现为上下振动;管道悬空阶段,波峰负向作用力和波谷正向力交替出现,管道在波浪作用下表现为前后振动;冲刷平衡阶段,管道主要在负向作用力下振动。Abstract: Due to the special meanings of submarine oil and gas pipelines in marine energy development,researchers have had a large number of safe experimental studies, and especially pay attention to the combined experiments made in different bottoms, different wave conditions and different burying depths. This present gutter test of wave aims at scouring and hanging-up which are dangerous to the pipeline security,in order to understand the relation between wave pressure on pipelines and the undercutting in silty seafloor represented by the Yellow River delta.The test result indicates that the pressure change is closely related with the undercutting course.Our continuous test shows that submarine pipeline is closely correlative with soil of sea bed and waves. The scouring and undercutting of pipeline under wave action experience three developing stages:silt stirring stage, current tunnel developing stage, swift undercutting and scouring equilibrium stage.Flow from the current tunnel plays an important role in scouring and undercutting.With scouring and undercutting, pipeline wave action transforms regularly from positive to negative force gradually, which can be divided into four developing stages:the initial scouring stage during which pipeline wave function is mainly positive,and pipeline shows vibrations under positive force; tunnel development stage during which pipeline vibrates up and down under the wave-crest lifting force and wave-trough downward-pulling force; pipeline hanging-up stage:pipeline vibrates forward and backward according to the negative wave crest and positive wave trough efforts; scouring equilibrium stage:pipeline vibrates mainly under negative force.
-
Keywords:
- seafloor pipeline /
- modeling test /
- wave force /
- direction angle /
- pipeline vibration
-
-
[1] Herbich J B. Offshore pipeline design elements[M]. New York:Marcel Dekkerinc, 1981:233.
[2] Kenneth R Demars, et al. Measurement of wave induced pressures and stresses in a sand bed[J].Marine Geotechnology,1985,6(1):20-59.
[3] Brennodden H, Sveggen O,Wagner D A,et al. Full-scale pipe-soil inter-action tests[C]//Proceedings of the Eighteenth Annual Offshore Technology Conference,OTC 5338, 1986:433-440.
[4] Wagner D A,Murff J D,Brennodden H, et al. Pipe-soil interaction model[C]//Proceedings of Nineteenth Annual Offshore Technology Conference.1987:181-190.
[5] Allen D W, Lammert W F,Hale J R, et al. Submarine pipeline on-bottom stability:recent AGA research[C]//Proceedings of the Offshore Technology Conference.1989:121-132.
[6] Brennodden H, Lieng J T,Sotberg T, et al. An energy-based pipe-soil interaction model[C]//Proceedings of 21st Annual Offshore Technology Conference.1989:147-158.
[7] Ch Madhu Sudhan, Sundar V,Narasimha S Rao. Wave induced forces around buried pipelines[J]. Ocean Engineering,2002,29:533-544.
[8] 闫澍旺, 王金英. 往复荷载作用下软粘土中浅埋管道的稳定性的振动台模型试验研究[J].海洋工程,1998, 16(4):39-47. [YAN Shu-wang, WANG Jin-ying. Research on stablity of marine pipelines buried in soft clay under cyckic loading by model testing on the Vibrating table[J]. Ocean Engineering,1998,16(4):39-47.]
[9] 高福平, 顾小芸, 浦群. 海底管道失稳过程的模型试验研究[J].岩土工程学报, 2000, 22(3):304-308. [GAO Fu-ping, GU Xiao-yun, PU Qun. Study of model test on the course of submarine pipeline losing stabilization[J].Geotechnical Engineering Transaction, 2000, 22(3):304-308.]
[10] 任艳荣, 刘玉标, 顾小芸. 多孔弹性海床上的管土相互作用数值模拟[J].中国海洋平台,2004,19(5):15-19. [REN Yan-rong, LIU Yu-biao, GU Xiao-yun. Numerical simulation on the reciprocity between pipeline and soil on multiorifice elastic seabed[J].Chinese Platform,2004,19(5):15-19.]
[11] 高福平, 顾小芸, 吴应湘. 考虑波-管-土耦合作用的海底管道在位稳定性分析方法[J]. 海洋工程, 2005, 23(1):6-12. [GAO Fu-ping, GU Xiao-yun, WU Ying-xiang. Analysis method of stabilization of submarine pipeline calculating coupling function of wave-pipeline-soil[J].Ocean Engineering, 2005,23(1):6-12.]
[12] 李玉成, 陈兵. 海底管线上波浪力的大涡模拟及三步有限元数值模拟[J].海洋学报,1999,21(6):87-93. [LI Yu-cheng, CHEN Bing. Large eddy simulation and three steps finite element numerical simulation on submarine pipeline[J].Acta Oceanologica Sinica,1999,21(6):87-93.]
[13] 李广雪, 庄克琳, 姜玉池. 黄河三角洲沉积体的工程不稳定性[J].海洋地质与第四纪地质, 2000,20(2):21-26. [LI Guang-xue, ZHUANG Ke-lin, JIANG Yu-chi. Engineering instability of body of the deposit of Yellow River Delta[J]. Marine Geology and Quaternary Period Geology, 2000, 20(2):21-26.]